Expression of Interest North West Sydney

Anglicare

DUE: 05:00 PM on Tuesday, 24 October 2023

Introduction

Anglicare Sydney is a Christian not-for-profit supporting people at all stages of life across the greater Sydney and Illawarra regions.  For over 160 years Anglicare has been serving those in need - providing care to older people and services to the vulnerable. Today they employ 4,000 staff and serve alongside 2,000 volunteers. For further information please visit their website https://www.anglicare.org.au/  

Contact Sydney

Premises that meet these requirements should be nominated and submitted to our office electronically by:
05:00 PM on Tuesday, 24 October 2023
Submissions are to be lodged with:
LPC
Attn: Edward Andrews
eandrews@lpc.com.au

Brief

Type of Accommodation
Quality office accommodation consistent with PCA A grade office matrix.
Lettable Area
Subject to final space planning an area of between 1,100 to 2,400 sqm is required, with expansion and contraction rights of up 50% +/- during the lease term. The preference is to be located over a single floor, and no more than two floors that are well connected visually (ie inter-connecting stairs).
Location
A building that is within walking distance to public transport is essential. First preference: Norwest and Macquarie Park. Second preference: Parramatta and St Leonards / Crows Nest.
Lease Commencement Date
A lease commencement date of 1 April 2025.
Access Date
Access for fitout will be required 9 months prior to lease commencement with the ability to trade from the premises upon the completion of the fitout works.
Lease Term
An initial lease term of up to 10 years will be considered.
Premises Condition
Premises that benefit from a high quality modern open plan collaborative fitout consistent with the requirements outlined below will be well regarded, however, consideration will also be given to refurbished premises (devoid of any fitout). The ideal fitout is an activity or task-based fitout, consisting of a range of spaces including approximately: • 100 to 210 workstations (no offices) • 8 quiet rooms • 6 meeting rooms (various sizes) • Various collaboration spaces • 1 x Boardroom (18 pp) • Front of house (possibly integrated within the breakout area) • Large breakout/kitchen area • Wellness room, utility, and support spaces.
Parking
Please confirm the number of exclusive and dedicated car spaces that can be made available. There is currently a high car parking utilisation.
Surrounding Amenities
Please confirm the amenity available within the building and precinct. Our client will be focused on ensuring that the building and precinct benefit from a high level of amenity and contribute to attracting and retaining staff. As a minimum the amenity will provide: • Cafes • Take away and dining opportunities • End of trip facilities (shower / bike racks etc) • Gyms and exercise rooms and spaces • Access to green spaces and parks etc. • Childcare
Expansion Rights
The provision for option terms and known expansion rights.
Contraction Rights
The provision for known contraction, and early termination rights at any time from the expiration of year 5 is a requirement.
NABERs Rating
Sustainability is important, please confirm the current building ratings and targets, including in particular NABERS Energy and Water as well as Net Zero Carbon targets and availability of electric vehicle charging.
Reimbursement of Consultants Cost
Our client requires reimbursement of their professional occupier advisory fees.
Other
Please confirm the names of other tenants within the building and precinct.
Agent Appointments
LPC will not be involved in the resolution of any dispute that may arise between agents, agency firms or consultants in respect of introductions.

Call us or complete the form and we'll call you.